A meeting was held in the city of Osh

Елена Краснова Economy / Exclusive
VK X OK WhatsApp Telegram
A meeting of the collegium was held at the Osh City Council, dedicated to the results of the socio-economic development of the city for the year 2025, as reported by the press secretary of the city administration, Zhyldyzbek Bolotbekov.

On February 17, under the chairmanship of the head of the Cabinet of Ministers, Adylbek Kasymaliev, a meeting took place to evaluate the work of the city administration over the past year.

At this meeting, the city administration received a high rating of "excellent." "The mayor opened and closed the meeting. In the end, it was emphasized that the work of the administration deserves an 'excellent' rating. We have already stated that the rumors circulating on social media about the mayor are not true. He continues to fulfill his duties," noted Bolotbekov.

During the collegium meeting, it was noted that in 2025, the economy of Osh developed with positive dynamics. The volume of industrial production amounted to 13 billion soms, with a physical volume index of 127%. Many large production and logistics facilities were also put into operation.

The revenue part of the city budget (including official transfers and assets) reached 9 billion 691 million soms. More than 3 billion soms were attracted for the construction and development of municipal markets, where 4,200 trading places are now located, bringing the total number to 7,500.

In 2025, the city attracted 48 million dollars in foreign investments.

A total of 1 billion 808 million soms was allocated for the construction and repair of social and communal facilities (334 million from the local budget, 474 million from the republican budget, 100 million from the Stabilization Fund, and 900 million from the republican budget).

More than 4 billion soms were spent on improving road infrastructure, constructing social facilities, and strengthening the material and technical base of budgetary institutions.

In the city, construction work was completed on 82 new facilities and major repairs on 43 facilities.

Repairs were carried out on 81 streets and road sections: asphalt was laid on 106 km of roads and 25 km of sidewalks.

As part of mortgage and shared housing construction programs, hundreds of families were provided with housing, including 302 families through the city administration's mortgage program.

To ensure uninterrupted water supply, a reservoir with a capacity of 21,000 cubic meters was put into operation, with water coming from 14 wells.

Construction has begun on a plant for the disposal of solid household waste and electricity generation, with a total investment in the project amounting to 95 million dollars.

As part of the greening and landscaping program, about 10 new parks and squares were built, and the central squares and recreation areas were completely renovated. Four monuments symbolizing international friendship and beautifying the city were installed.

A municipal night shelter with 45 places for people in difficult life situations and lonely women was opened on Alymbek-atka Street. A municipal night shelter with 50 places was also opened, and a temporary heating point was organized at the social institution "Boorukerdik."

Five schools and a dormitory for 500 places were put into operation, and additional construction is underway for buildings at 4 schools, as well as major repairs at 7 schools.

In the field of preschool education, the construction of 5 kindergartens has begun, 3 of which are already open, while construction work continues on 2 others.

In the Ak-Tilek microdistrict, an additional building for a clinical hospital with 300 beds is being constructed, with work completed at 90%, and completion is planned for March 2026.
VK X OK WhatsApp Telegram

Read also:

The Great Silk Road

The Great Silk Road

The Significance of the Great Silk Road. In the historical fate of the Kyrgyz and their state...