Ministry of Energy: 134.64 km of SIP lines will be updated and built in the Osh region

Арестова Татьяна Exclusive
VK X OK WhatsApp Telegram
The material was prepared by the K-News editorial team. The use of the text, either partially or in full, is only possible with the consent of the editorial team.

In 2026, extensive construction and reconstruction projects are planned in the Osh region. According to information from the Ministry of Energy of Kyrgyzstan, 134.64 kilometers of overhead power lines will be updated and built using self-supporting insulated wires (SIP).

These activities are aimed at implementing modern technologies, which in turn will improve the quality of electricity supply, reduce the number of emergency outages, and decrease technical losses.

The upcoming work for 2026 includes:

• Construction of a new 10 kV overhead line — 16.33 km

• Reconstruction of the 10 kV overhead line — 50.67 km

• Construction of a new 0.4 kV overhead line — 15.3 km

• Reconstruction of the 0.4 kV overhead line — 52.34 km

The Ministry of Energy emphasizes that these activities will ensure reliable, high-quality, and safe electricity supply for the residents and consumers of the Osh region. The work will begin in March and last until November, which corresponds to preparations for the autumn-winter season.

There are also plans to continue modernizing the energy infrastructure in the future.

For questions related to electricity supply, you can contact the 24-hour call center:

Call center: 105; 1209

0772001209

0556001209

The article from the Ministry of Energy: 134.64 km of SIP lines will be updated and built in the Osh region first appeared on the K-News website.
VK X OK WhatsApp Telegram

Read also:

Zone "Talas"

Zone "Talas"

The "Talas" zone is located in the central part of the Talas River valley and includes...