In some areas of Bishkek, there will be no electricity on October 28 due to repair work. List

Ирэн Орлонская Local news
VK X OK WhatsApp Telegram
The Bishkek Electric Network Company has announced the schedule for planned work and maintenance scheduled for October 28, which may lead to temporary power outages.




































































































Electric NetworksSectionTimeReason
fromto
Eastern RESmicrodistrict Kok-Zhar, railway No. 11 (3-4 floors, from 1-5 floors)09:3017:00capital repair of VRU-0.4kV and R/SH-0.4kV from TP No. 942
12 microdistrict railway No. 12, 12/1installation of input switch 0.4kV from TP No. 3827
Western RESsections of Erkindik Blvd, Jumabek St, Tynystanova09:0013:00installation and assembly of automation 0.4kV from TP No. 1170
railway microdistrict Archa-Beshik (Chortekova St, Badakhshan, Jazira)09:0014:00capital repair of RU-0.4kV equipment and preventive repair of transformer TM-400/10kVA TP No. 2912
railway microdistrict Orokrepair of VN-16 at RR-42 TP No. 2914
Erkindik Blvd, railway No. 6309:0017:00current repair of RSH-0.4kV and GRSH-0.4kV TP No. 1170
 railway microdistrict Archa-Beshik (Ak-Shyyrak St, Kuyukova)dismantling of old wires and traverses, connecting subscriber inputs from TP No. 2109
 railway microdistrict Ala-Tuu (Uluk-Tuu St, Joon-Dobo, Baichichekey)trimming branches and re-tensioning wires of VL-10 kV PS "Ak-Ordo" to TP No. 2682
 sections of Abdumomunov St, Koenkozov Stcapital repair of RU-6/0.4 kV TP No. 3880
 railway microdistrict Selection (Ular St, Erkindik)14:0017:00application of dispatcher names and painting of ZHK TP No. 3107
Northern RESvillage of Nizhny Ala-Archa (North Passage, Chagay St)09:0012:00replacement of wooden poles with concrete ones No. 8 VL-0.4kV TP No. 4453
railway microdistrict Zhenish09:0013:30switching subscriber inputs to SIP-2 wire and dismantling 0.4 kV wire and traverse VL-0.4kV TP No. 3090, pole No. 1-11
railway microdistrict Muras-Ordo09:0018:00switching subscriber inputs to SIP-2 wire and adjusting VL-0.4kV schemes TP No. 3241
sections of Troitskaya St, P. Lumumbalaying and installation of cable output -0.4kV from TP No. 537 to pole No. 1 VLI-0.4kV TP No. 537
 village of Maevka (Greenhouse Passage)10:0018:00replacement of PU and inputs-0.4kV VL-0.4 kV TP No. 4280

 
VK X OK WhatsApp Telegram

Read also:

Fomin Boris Vasilyevich

Fomin Boris Vasilyevich

Fomin Boris Vasilyevich Candidate of Technical Sciences Born in 1941. In 1963, he graduated from...

Kara-Archa Waterfall

Kara-Archa Waterfall

Kara-Archa Waterfall - left tributary of Kegety (Chui region) Coordinates: 42.504977, 75.069273...

Issyk-Kul Region

Issyk-Kul Region

The Issyk-Kul Region is located in the eastern part of Kyrgyzstan. It was established on November...

Write a comment: