
Photo by the Bishkek City Hall
The press service of the city hall reported that during the visit, the city authorities familiarized themselves with the current temperature readings and electricity loads, as well as assessed the readiness of the CHPP to operate under increased loads.
Additional emergency teams were created at the CHPP, round-the-clock duty of staff was ensured, and strict control over the condition of the equipment was introduced.
As a result of the inspection, the mayor instructed to keep the operation of the heat and power plant under special control to guarantee stable heating and energy supply for the city's residents during the cold period.