The head of the cabinet instructed to expedite coal exports from the "Torugart-1" pit.

Виктор Сизов Politics
VK X OK WhatsApp Telegram
First, Adylbek Kasymaliev checked the operation of the updated citizen service point at the "Torugart" checkpoint. During the visit, he was also shown the border service unit "Chatyr-Kol" and the living conditions of the military personnel.


Photo by the press service of the KR Cabinet.



Photo by the press service of the KR Cabinet.



Photo by the press service of the KR Cabinet.



Photo by the press service of the KR Cabinet.

After that, the head of the Cabinet of Ministers headed to the coal pit "Torugart-1," which began its operations on November 12 of this year.

Photo by the press service of the KR Cabinet.
Currently, OJSC "Kyrgyzkomur" holds a license for the exploration of an area of 557.6 hectares in the "Torugart-1" coal deposit, located in the At-Bashinsky district. Coal presence has already been confirmed over an area of 25 hectares, with a total reserve estimated at 423.4 thousand tons. About 10 thousand tons of coal fuel have been extracted here.

Photo by the press service of the KR Cabinet.
The Chairman of the Cabinet of Ministers emphasized the need to ensure the stable operation of the "Torugart-1" coal pit and the prompt export of its products.

Photo by the press service of the KR Cabinet.
VK X OK WhatsApp Telegram

Read also:

Write a comment: