At the construction site of a 12-story residential complex on Leo Tolstoy Street, the quality of concrete was checked

Елена Краснова Local news
VK X OK WhatsApp Telegram
The department reported that the field tests were conducted at the construction site located at: 126 Leo Tolstoy Street. Specialists checked the quality of the concrete and its compliance with established regulatory requirements.

In the Ministry of Construction, it was emphasized that such control measures are necessary to ensure the reliability and safety of the residential buildings under construction, as well as to comply with building codes and standards.
VK X OK WhatsApp Telegram

Read also: