
On Kurmandzhan Datka Street, located between Jibek Jolu and Chuy Avenues, the construction of sidewalks continues. The work here is delayed due to the need to relocate engineering communications.
The mayor instructed to complete these works within five days, noting that otherwise, the mayor's office would take over the tasks.
During the inspection, the mayor emphasized the need for quality bike lane construction and suggested considering the installation of U-shaped traffic lights. Additionally, he demanded increased control over illegal parking, promising that municipal inspection staff are already on-site issuing protocols to violators.
On Mederov Street, the mayor expressed dissatisfaction with the slow pace of work by BGTS. He demanded to expedite the process and, if necessary, involve additional contractors, as well as consider the possibility of applying sanctions for non-compliance with deadlines.
During his visit to Vostochnaia Street, a resident approached the mayor with a request to organize public transport movement and install a stop. The citizen also complained about a municipal employee who does not respond to the phone number provided in the official response.
Aibek Junushaliev called this number himself, but there was no answer.
As a result of the inspection, the mayor reprimanded the responsible employee and urged for careful verification of the accuracy of contact information provided in documents in the future. He also emphasized the need for disciplinary measures, including dismissal, in case of repeated incidents.










Then the mayor checked the construction of the underground passage on Chingiz Aitmatov Avenue and instructed to open traffic as soon as possible.
In conclusion of his inspection, he examined Fuchik Street, where sidewalk reconstruction work is underway, and strongly recommended increasing control over the quality of the work being performed.