SEDOV Viktor Evgenievich

admin Architects of Kyrgyzstan
VK X OK WhatsApp Telegram
SEDOV Viktor Evgenievich


SEDOV Viktor Evgenievich

Architect. Laureate of the State Prize of the Kyrgyz SSR in the field of science and technology.
Born in 1948 in the city of Frunze, Kyrgyz SSR.
In 1971, he graduated from the architectural faculty of the Frunze Polytechnic Institute. He has been working at the design institute "Kyrgyzgiprostroy" since 1974. Currently, he is the chief architect of the workshop.
Member of the Union of Architects of the USSR since 1977.
For a long time, he collaborated creatively with E. G. Pisarsky on the creation and improvement of the "105" series of large-panel residential buildings for areas with seismicity of 8 and 9 points. The block-sectional method used as the basis for the series formation ensured high mobility of urban space and provided the architect with material for creating specific residential building projects.

MAIN CONSTRUCTIONS

1976. 5- and 9-story residential buildings — representatives of the "105" series in the city of Frunze (as part of a team);
1985. Building of the Issyk-Kul Regional Committee of the Communist Party of Kyrgyzstan in Przhevalsk (as part of a team).

MAIN PROJECTS

1972. Department store with 18 workplaces in the Kirov district center of the Talas region (as part of a team);
1974. "Kyrgyzmebel" boarding house for 500 places on Lake Issyk-Kul;
1975—1985, 5- and 9-story large-panel block sections of the "105" series (ordinary, end, corner, turning), standard projects (as part of a team);
1975, 5- and 9-story residential buildings of the "105" series, standard projects (as part of a team);
1976. "Construction" pavilion at the VDNH of the Kyrgyz SSR (as part of a team);
1977. 9-story dormitory for workers and employees for 590 places, standard project (as part of a team); 5-story large-panel block sections of the "105" series for the Osh DSK, standard projects (as part of a team);
1978. 5- and 9-story large-panel block sections of the "105" series with a uniform step, standard projects (as part of a team); 142-apartment large-panel residential buildings for areas with seismicity above 9 points (as part of a team);
1979. 9-story 252-apartment gallery residential building for small families, standard project (as part of a team);
1981. 4-story dormitory for workers and employees for 426 places of the "105" series, standard project (as part of a team);
1981—1983. 4-, 5-, 9-story large-panel residential buildings of the "105" series for the Przhevalsk DSK, standard projects (as part of a team); 1982. 9-story residential building made of monolithic reinforced concrete, standard project (as part of a team);
1983. 4-story block sections made of monolithic reinforced concrete for the Kazarman ZRK (as part of a team); 3 2-story residential buildings for rural areas made of products from the "105" series, standard projects (as part of a team);
1984. 9-story 96-apartment residential building with service premises, with a system of disconnecting connections, experimental project (as part of a team);
1985. 9-story large-panel block sections with two longitudinal walls (for 9 points), standard projects (as part of a team).

COMPETITION WORKS

1979. Republican competition. Series of individual residential house projects for rural areas of the Kyrgyz SSR (as part of a team, III, encouragement prize); Library for 3 million volumes in the city of Frunze (as part of a team, encouragement prize);
1984. Republican competition. New series of residential buildings for the city of Frunze (as part of a team, I prize);
1985. All-Union competition. Series of single-family residential houses (SA diploma).
VK X OK WhatsApp Telegram

Read also:

Write a comment: