How "Chuy Electric Networks" Prepares Kyrgyzstanis for Winter: Savings, Timely Payments, and "Smart" Meters

Сергей Мацера Economy
VK X OK WhatsApp Telegram
- The leading sales specialist for electricity at the branch "Chui Electric Networks" of the Open Joint Stock Company "National Electric Network of Kyrgyzstan," Meerim Bektemirova, revealed details of measures aimed at saving energy, timely payments, and the implementation of "smart" meters during the winter period in a radio interview.

According to the government decree dated May 28, 2025, No. 282, work is actively underway with large consumers, such as cafes and restaurants. The population is becoming aware of the importance of these measures and is actively cooperating. Notifications about important innovations are communicated via WhatsApp.

"Smart" meters: Currently, they are installed for 30% of the subscribers of "Chui Electric Networks." By the end of the year, the number is expected to increase by 110,000. It is anticipated that by 2025, coverage will reach 40%, and by 2026, 70%, while the remaining installations are planned for 2027.

Load control: In case of exceeding the established limit (for example, 5 kW), automatic disconnection occurs (upon reaching 5.1–5.2 kW). To restore electricity supply, it is sufficient to turn off one of the devices, which will help reduce the load.

Heating in the winter period: It is recommended to use plastic windows and wall insulation to improve energy efficiency.

Daylight in cafes: Street lighting operates automatically — it turns on at night and turns off at dawn. Sensors are installed in establishments.

Industrial sector: Sensors and technical conditions are also applied to optimize consumption. Resource savings prove beneficial for enterprises and help avoid halting production processes.
VK X OK WhatsApp Telegram

Read also:

Write a comment: