
Last Wednesday, hydrotests of the cargo system were conducted on the restored device, and divers opened the terminal manifold on the underwater oil pipeline. On Sunday, the process of positioning the tanker for oil transshipment was carried out, as reported by KTK.
As a result, at the moment, oil loading at the terminal is being carried out in normal mode through two mooring devices.