Shortage of Coal? What is Happening at the Coal Deposits of Kara-Keche and Ak-Ulak
According to the Joint Stock Company "Kyrgyzkomur," since the beginning of 2025, 978,584 tons of coal have been extracted at the Kara-Keche open-pit mine, which has been used to supply the population and for deliveries to the CHP in Bishkek. The extraction is carried out using 255 units of special equipment. In the republic, 132 fuel depots have been opened, where coal is sold at prices ranging from 3,290 to 6,800 soms, depending on logistics and distance. Two coal sorting machines are operating at the open-pit mine.
After that, the minister headed to the Ak-Ulak coal deposit, where 30% of the extracted coal is used for the needs of the CHP. Responsible officials report that coal is also supplied to the population and used for social needs. A new sorting machine is currently being installed there, which will allow sending small coal to the CHP and large coal directly to the population.
Following the inspection, the minister instructed the responsible services to ensure stable coal supplies to the population, organize round-the-clock shifts for drivers, and maintain coal availability for citizens in a regular mode.
Read also:
The Minister of Energy of Kyrgyzstan Checked the Operation of Coal Deposits
During the trip, the minister familiarized himself with the operation of coal deposits and...
8,000-12,000 tons of coal are being exported daily from the Kara-Keche deposit, - "Kyrgyzkomur"
On the air of the radio on November 12, the Deputy Director of OJSC "Kyrgyzkomur,"...
The Minister of Energy instructed to ensure round-the-clock delivery of coal to the population
During a visit to the branch of OJSC "Kyrgyzkomur" in Balakchy, Minister of Energy...
A temporary restriction on entry to the territory of Kara-Keche for private individuals is being introduced.
Photo from the internet Temporary restrictions are being introduced for private carriers in the...
Minister of Energy: To provide the population with affordable coal, drivers must work in shifts day and night
Minister Ibraev emphasized the importance of uninterrupted coal delivery, ordering the creation of...
In Karakol, the sale of coal at a reduced price has begun
In Karakol, local authorities announced the sale of coal at a reduced price, reports Turmush...
How much does coal cost in the Ak-Talinsky District and will it last through the winter?
In the Ak-Talinsky district, located in the Naryn region, the price of coal ranges from 3,800 to...
"Kyrgyzkomur" Increased Coal Production and Profit by 52 Percent
As part of the meeting of the board of the Ministry of Energy of the Kyrgyz Republic, OJSC...
In the rural district of Shumkar-Uya, coal sales have begun at a reduced price
In the Talas region, in the village of Sasyk-Bulak of the Shumkar-Uya rural district, the sale of...
Taalaybek Ibraev instructed to temporarily suspend coal supply to Bishkek CHPP. Why?
According to the Minister of Energy Talaybek Ibraev, the coal reserves at the Bishkek CHPP amount...
Coal supply to Bishkek CHPP suspended for 10 days — Ministry of Energy
The temporary suspension of coal supplies to the Bishkek CHPP has been announced for a period of...
Coal
Coal deposits in the republic are grouped into 4 basins (Southern Fergana, Uzgen, Northern...
In 9 months, 655.3 thousand tons of coal were extracted
- At the meeting of the board of the Ministry of Energy, OJSC "Kyrgyzkomur" presented a...
The state enterprise "Kyrgyzkomur" in Kara-Keche fined 139,000 soms after a compliance inspection
Employees of the Naryn Regional Office of the Ecological and Technical Supervision Service...
The Antimonopoly Agency explained the increase in the maximum price of coal from "Kyrgyzkomur" in 2025
- On November 12, on the air of the radio, the head of the regulated sectors department of the...
The Ministry of Energy proposes to extend the ban on coal exports by another six months.
The Ministry of Energy of the Kyrgyz Republic has proposed to extend the existing ban on the export...
Kyrgyzstanis complain about the sale of bulk coal. Response from "Kyrgyzkomur"
At the Kabar agency, the director of OJSC "Kyrgyzkomur," Kairat Mamatov, commented on...
"Kyrgyzkomur Increases Coal Production and Profit by 52 Percent"
At a recent meeting of the Ministry of Energy of the Kyrgyz Republic, a report from OJSC...
In the Osh region, coal sales points opened at a social price of 6 soms per kilogram
The regional representative office of the president announced the launch of coal sales points in...
Testing of hydroaggregates after reconstruction has begun at the Toktogul and Uch-Kurgan hydropower plants.
Talaybek Ibraev, the Minister of Energy, familiarized himself with the completion of the...
In Bishkek and the Chuy Region, the sale of coal in bags should not exceed 250 soms – Kairat Mamatov
In Bishkek and the Chui region, coal in bags should not cost more than 250 soms per unit. This was...
Preparation for Winter: Where to Buy Coal in Bishkek
Photo by the press service of the city administration In anticipation of the heating season...
Coal this winter: "Kyrgyzkomur" will try not to raise prices
With the onset of winter, residents of Kyrgyzstan traditionally face problems with coal shortages...
More coal is being imported from Kazakhstan to Kyrgyzstan
According to data published by the National Statistical Committee, from January to August of this...
How much does local and imported coal cost in the city of Talas?
In Talas, local authorities, together with the antimonopoly service, held meetings with...
"Kyrgyzkomur" announced a competition for overburden works at Kara-Keche with a volume of 1 million cubic meters
- On November 6, OJSC "Kyrgyzkomur" announced a tender for services related to overburden...
Ecotechsupervision fined "Kyrgyzkomur" in Kara-Keche 139 thousand soms
The employees of the regional office of the Ecological Supervision Service inspected the...
How the city of Manas and the Suzak district are preparing for winter: The most expensive coal is selling well
This year, the government has set coal prices ranging from 5500 to 8500 soms per ton. In the...
Raids to Check Coal Quality Are Taking Place in the Chui Region
In the Chui region, checks are being conducted on coal for compliance with environmental standards....
In the Ak-Talinsky District, low-income families received coal for the winter
In the Naryn region, in the Ak-Tal district, the distribution of coal has begun for families in...
Where to buy coal in Bishkek? The city hall has published the addresses
As of November 11, 2025, the coal reserves are distributed as follows: • at fuel bases — 3,741...
In the city of Naryn, a maximum price for coal per ton has been set.
In Naryn, explanatory events were held, during which it was emphasized that the price of coal...
Brown coal production increased by 23.7% over 8 months, reaching 2.04 million tons
- From January to August 2025, various dynamics in coal production were observed in Kyrgyzstan....
Tonsky District: Residents of the village of Bokonbaev received coal at 5700 soms
Today, November 10, six trucks with coal were delivered to the village of Bokonbaev in the Ton...
Price Gouging on Meat Discovered in Markets of Kara-Suu
Monitoring of meat and coal prices in the Kara-Suu district revealed a number of violations....
Raids were conducted at coal sales points in the Pervomaisky District of Bishkek
In the capital's Pervomaisky district, inspections were conducted aimed at assessing the...
In Kyrgyzstan, control over coal and fuel prices will be strengthened
A meeting held at the administration of the President of the Kyrgyz Republic was dedicated to...
Kazakhstan Resumed Coal Supplies to Kyrgyzstan
In the coming days, the republic will receive about 424 thousand tons of Kazakh coal About 15 days...
The reconstruction of the fourth hydro unit of the Toktogul HPP has been completed
During his working trip to the Jalal-Abad region, the Minister of Energy of the Kyrgyz Republic,...
Chinese companies will build a solar power plant in Kyrgyzstan
At the international forum taking place in Suzhou, China, the Ministry of Energy of Kyrgyzstan...
Ready for the heating season!
The First Deputy Prime Minister of the Kyrgyz Republic, Taiyrbek Sarpashev, held a meeting with...
A new RES building opened in At-Bashi, Naryn region
Photo by the Ministry of Energy of the Kyrgyz Republic. New building of the At-Bashi RES...