
Ministry of Energy: The second hydro unit of the Uch-Kurgan Hydroelectric Power Station has been upgraded and is consistently generating electricity

Read also:
Без изображения
knews.kg | 525: SSL handshake failed
The material was prepared by K-News. Prior agreement with the editorial office is required for...
Ministry of Energy of Kyrgyzstan: The capacity of 5 substations has been increased in Bishkek
Among the substations that have undergone modernization are: — PS 110/10 kV "Kök-Jar" –...
Без изображения
By the end of 2026, two hydro units of the Uch-Kurgan HPP will be upgraded
It is expected that the upgrade of two hydro units at the Uch-Kurgan HPP will be completed by the...
The Ministry of Energy of Kyrgyzstan provided clarification on the "unlimited tariff" for electricity
In the official clarification from the Ministry of Energy, the following was stated: The proposal...
In Kyrgyzstan, the fourth hydro unit of the Toktogul HPP has been put into operation
Photo 24.kg. Machine hall of the Toktogul HPP The press service of the Ministry of Energy of...
Uch-Kurgan Reservoir
Uch-Kurgan Hydroelectric Power Station — a hydraulic engineering structure, a run-of-river...
The reconstruction of the fourth hydro unit of the Toktogul HPP has been fully completed.
The Minister of Energy became acquainted with the reconstruction of the fourth hydro unit of the...
Minister of Energy: To provide the population with affordable coal, drivers must work in shifts day and night
Minister Ibraev emphasized the importance of uninterrupted coal delivery, ordering the creation of...
In Bishkek, the second stage of the Design Code regulation begins
In Bishkek, the main architectural inspection, operating within the Department of Urban Planning...
In Kyrgyzstan, there will be no electricity shortage, said the Minister of Energy
The Minister of Energy of Kyrgyzstan, Talaybek Ibraev, stated on his social media that the country...
Ministry of Energy: Issyk-Kul PES has completed preparations for the autumn-winter period of 2025–2026
The Ministry of Energy of Kyrgyzstan has announced the completion of preparatory work at the...
The reconstruction of the fourth hydro unit of the Toktogul HPP has been completed
During his working trip to the Jalal-Abad region, the Minister of Energy of the Kyrgyz Republic,...
Kazakhstan and Uzbekistan Confirmed Readiness to Supply Electricity to Kyrgyzstan During the Autumn-Winter Period
At the meeting, the participants agreed on the main parameters of cooperation in the field of...
Без изображения
Testing of hydroaggregates after reconstruction has begun at the Toktogul and Uch-Kurgan hydropower plants.
Talaybek Ibraev, the Minister of Energy, familiarized himself with the completion of the...
Ministry of Energy: The European Union will allocate $1 billion for the construction of "Kambar-Ata-1"
At the forum, it was announced that the European Union is ready to allocate a total of $2.4...
The reconstruction of the Toktogul and Uch-Kurgan hydropower units has been completed.
The reconstruction of the fourth hydroaggregate of the Toktogul HPP and the second hydroaggregate...
The President of the Kyrgyz Republic gave a harsh assessment of the actions of the Minister of Energy due to the "Unlimited Tariff" for electricity.
Sadyr Japarov, the President of Kyrgyzstan, also instructed to immediately terminate the...
Без изображения
When will Kyrgyzstan stop buying electricity, said the head of the Ministry of Energy
The Minister of Energy, Talaybek Ibraev, stated on his Facebook page that Kyrgyzstan will not face...
The President gave a harsh assessment of the actions of the Minister of Energy Taalaibek Ibraev.
The President of the Kyrgyz Republic, Sadyr Japarov, expressed his dissatisfaction with the...
In Bishkek, the pilot phase of waste delivery to the new waste processing plant has begun
The Bishkek city administration announced the first trial delivery of solid household waste (SHW)...
Без изображения
The fourth hydro unit has been launched at the Toktogul HPP after reconstruction.
A project for the construction of floating solar power plants is planned at the Toktogul Reservoir....
Launched updated hydro units of Toktogul and Uch-Kurgan hydropower plants
In the Jalal-Abad region, the Minister of Energy of Kyrgyzstan, Talaybek Ibraev, conducted a...
Uch-Kurgan Hydroelectric Power Station: Reconstruction of Unit No. 3 Completed by 98 Percent
Active work continues at the Uch-Kurgan Hydroelectric Power Station, which plays a key role in the...
"Unlimited Electricity Tariffs Have Been in Effect in Kyrgyzstan for Three Years"
Currently, more than 4,500 subscribers are using this service Unlimited electricity tariffs in...
The State Committee for National Security of Kyrgyzstan detained students from India. They were selling drugs through Instagram.
The operational actions led to the detention of two Indian nationals, "D" born in 2006...
And will shopping centers and cafes save electricity?
Kyrgyzstani residents are anxiously awaiting the cold The question of whether shopping centers,...
The National Bank of Kyrgyzstan explained how the consumer credit law will work
President Sadyr Japarov signed the Law "On Consumer Credit" on October 30, 2025, which...
Minister of Energy Ibraev: Most of Atambayev's Statements Are Pure Lies
Energy Minister Talaybek Ibraev responded to recent statements made by Almazbek Atambayev...
The Military Prosecutor's Office uncovered intentional supplies of substandard products to military units in Kyrgyzstan.
As part of a criminal case, an individual entrepreneur "V.K." has been detained as a...
How to Register an Individual Entrepreneur through the Taxpayer's Cabinet?
How to register as an individual entrepreneur through the Taxpayer's Cabinet? This question...
Violations Identified During the Renovation of the Maternity Hospital in Talas
As a result of the inspection, a fine of 200,000 soms was imposed on the contracting organization...
GKNB KR: 80 hectares of land returned to state ownership in the Issyk-Ata district
As a result of investigative and operational actions conducted as part of the investigation, 80...
In Bishkek, the national corporate race "Business Run KG 2025" took place.
On this day, the run took place in the format of a team relay over distances of 5 and 10 km. Each...
Searches conducted at the residences of members of "Hizb ut-Tahrir al-Islami" in the Talas region
On October 15, 2025, searches were conducted in the homes of members of the banned extremist group...
"Ministry of Energy needs to apologize to the people and develop measures to overcome the electricity shortage"
The summer period allowed for energy savings, but with the arrival of winter, this becomes...
Wild animals captured in camera traps in the Salkyn-Tör State Nature Park
In June 2025, in the Naryn region, as part of a scientific research expedition, employees of the...
Akzhol Makhmudov became the winner of the VI Islamic Solidarity Games
At the VI Islamic Solidarity Games, taking place in Riyadh, the capital of Saudi Arabia, Akzhol...
The Ministry of Energy of Kyrgyzstan signed an investment agreement with two Chinese companies for the construction of a solar power plant.
At the International Forum held in the Chinese city of Suzhou, an Investment Agreement was signed...
GKNB KR: Head of the Karakol Municipal Enterprise "Vodokanal" Detained
The State Committee for National Security of Kyrgyzstan reported the discovery of abuse of...
Former Deputy Head of the Jogorku Kenesh Apparatus Arrested for Extortion
During investigative and operational activities, the fact of receiving 200 thousand US dollars by...
Temir Sariyev on the Customs Union
“Representatives of the business community will benefit from joining, but there is a risk that...